Install the next row of plywood into position by.
Proper installation of hclips on roof sheathing.
Home builder s guide to coastal construction 7 1.
Always check for level nailing surface.
This process starts with nailing them into the parallel beam.
This video shows how some roofs fail under heavy winds in uplift situations.
How to use plywood clips step 1.
Properly fasten panels including fastening and spacing hints step 4.
Not always required but a good idea.
To provide information about proper roof sheathing installation emphasize its importance in coastal construction and illustrate fastening methods that will enhance the durability of a building in a high wind area.
Roof sheathing installation 1 of 3.
Position plywood clips onto the top or upper horizontal edge of the installed plywood panels between each rafter.
During a hurricane the strength of the sheathing on the roof can greatly impact the homes ability to weather the storm.
Ventilate the roof according to current building codes step 3.
Keep these tips in mind when roofing in hurricane areas.
And scroll down to see more details on each with installation hints and tips below.
These nails go through the base plate of the clip.
Space joints on adjoining rows by two framing members.
Slide the sheet one rafter width over the end of the roof so the edge is centered on the next rafter offset one rafter spacing from the first piece of installed sheathing from the row below.
Some older h clips do not provide a built in gap.
Fasten panels with a minimum of.
H clips provide additional stiffness between bearing points for the unsupported edges of wood panel plywood or osb roof sheathing along with the necessary 1 8 gap for expansion as shown below illustrated on a bag of simpson h clips.
Install h clips between adjacent rows of panels every 12 to 16 inches but not over framing members.
Provide roof ventilation according to building codes see hints below and figure 2.
Cover sheathing with.
Keep nails 3 8 inches from the edges.
Check the nailing surface is level step 2.
Hammer in the clip to the parallel beam using 2 5 inches 6 4 cm nails.
Click to expand contents.
Once you ve spaced out where you are going to attach the clips they are ready to be attached.
Install a full horizontal row of plywood sheathing following standard practices.