Align the leading bottom edge of the first piece on the gable rake with the front edge of the drip edge installed on the eave.
Proper way to install roof drip edge.
Save yourself some.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Once all the underlayment is applied go back and place.
Overlap pieces at least a couple of inches shingle style with pieces higher up on the roof overlapping pieces lower.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
When this occurs the water may run back under the edge of the shingles often wetting the roof deck.
Slightly open the hemmed edge to slide this piece over top of the installed piece on the eave.
Three tips for overlapping drip edge flashing.
Preformed drip edge can be made of aluminum galvanized steel or copper.
How to install a drip edge.
If it doesn t pull the drip edge out slightly from under the shingles.
How to install drip edge flashing to a new roof.
Make sure the outer edge extends over the gutter.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
No cutting is needed for this piece.
This could cause the sheathing or fascias to rot after a few years.
Install roof drip edge along the eaves add underlayment then place drip.
On the gable rake install drip edge starting at the bottom and working up.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Secure the drip edge with roofing cement.
Place the metal roof drip edge flashing along the gable ends.
The causeway connecting the house to the new garage in law suite needs a roof.
The easiest way to prevent this from happening is to install a drip edge at the eave and the rake.
Tom silva starts off his roofing lesson with the apprentices by stressing the.
When lapping the eave metal overlap them so the seam faces away from the direction of prevailing view.