Preparing to add rolled roofing 1.
Putting down rolled roofing.
Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
Take proper safety precautions.
The roofing should extend 1 inch beyond the drip edge.
In roofing one square equals 100 square feet.
Once the first row is done add approximately two inches of cement to the top of the first row to secure the second row of roofing.
How to do it attach first course.
Roofing contractor maintenance professional expert interview.
Plan so that no two butt joints are closer than 2 feet from each other.
Nail down the 18 inch roll roofing sheet that it is covering the valley.
Step 4 trim any roofing that extends beyond the edge of the roof.
Go to your local hardware or building supplies store and ask for.
It not only protects the roof but it also protects the fascia.
To seal a plumbing vent spread roofing.
The roofing should overhang the eaves by inch except where you install drip edge flashing on top of the roofing along the rake edge.
An underlayment of felt roofing is optional.
Melting bitumen rolls 1.
Bitumen roofing rolls can be large and heavy so get help.
Wear heavy duty gloves and work boots.
Drip edge or drip cap is either plastic or sheet metal.
Installing the torch down roofing involves flames and melted asphalt.
Install peel and stick roofing in a similar manner.
Roll modified bitumen roofing sheets over the entire roof.
Cut the bitumen sheets to length with a.
Purchase the appropriate amount of rolled roofing.
The nails should start 3 4 inch from the edges of the roofing and be 6 inches apart throughout the roofing s surface.
You will need 1 10 gallon of lap not mastic cement for every roll and 2 pounds of roofing nails for every square.
X expert source david bitan.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.