Set a rain barrel on top of the concrete pavers.
Rain gutter corner installation.
Attach a short length of downspout to the.
Snap the sections together.
Cut a two inch long notch in the front lip of the gutter with tin snips to join a rain gutter section.
If adding a rain barrel.
Mitered corners from berger bp help make gutter installation easy.
Watch how to create a mitered corner from one of america s oldest and most trusted buildin.
Rain gutters should be attached to the fascia and run the entire length of the roof ending with a downspout.
After removing the old corner clear away the old sealant with the 121 high speed cutter.
If the gutter run measures longer than 40 feet 12 2 m it should be positioned to pitch down from the middle aimed toward a downspout at each end.
Position the new corner and drill holes for the pop blind rivets.
Install a diverter in the downspout positioning it even with the top of the rain barrel.
While it makese sense to slightly slope the gutter toward the downspout about 1 4 in.
Project step by step 20 cutting the gutter.
Set two 2 inch thick concrete pavers on the ground directly below the downspout outlet.
It s much easier to join sections on the ground than to work from the top of a ladder.
Use a measuring tape to determine the length of the gutter.
When drilling try to use the same holes from the old gutter corner.